Concrete Water Tower
ACOTHANE CASE STUDY
Concrete Water Tower
​
A full internal refurbishment was carried out to the walls, floor and shaft of the high level tank in this concrete water tower, in 2017.
​
After removal of the existing failed asphalt render system, all internal concrete surfaces and pipework were grit blasted to remove all traces of the remaining bitumen primer.
​
All concrete surface were then re-levelled using a cementitious fairing coat, and all expansion joints were sealed using a flexible overbanding system.
​
After cure of the cementitious render, heating and de-humidification equipment was installed to ensure that the correct application conditions were achieved.
​
Acothane DW solvent free polyurethane coating system was chosen as the new waterproof lining material.
​
With its regulation 31 approval from the drinking water inspectorate, tough polyurethane finish with a degree of flexibility and 7 day cure, the system was hand applied to all walls, floor , columns and shaft.
​
Acothane LV sealer was applied to all surfaces followed by two full coats of Acothane DW to achieve a minimum final thickness of 1mm.